Sunday, October 2, 2011

Demolition Man



At 4:15 p.m. on Sunday, he decides to re-do the loose tile in the back hallway. I don't really know what happened, but within 45 minutes all the tiles were removed and relocated to the patio, two 5-gallon buckets of broken tile, dust and mortar were sitting in the kitchen. It already looks better!

He proceeded to chip the old adhesive and smooth out the floor - It's Oak hardwood flooring! Why tiles were set on top of this beautiful floor will always be a puzzlement to us. Almost every single tile was broken, cracked, chipped or in some way compromised. I'm glad the tiles are gone.

We have decided to install Pergo on the floor. This will be a huge improvement. Can't wait!