Thursday, September 2, 2010

Barn Update!!

Barn should be delivered Sept 16-17-18 ish - comes in two loads on three oversized trucks - first day the two bottom pieces (stalls) then the next day the top piece - (hay loft with a crane). So much needs to be done in the meantime - TWENTY (20) concrete footers have to be poured and the center aisle needs to be poured. This means that the site will have to be bladed off, prepped with sand/gravel base and the footers installed with time for the concrete to cure. Time is flying by.

No comments:

Post a Comment