Friday, July 2, 2010

Brilliant Idea and Strategy

We've been going around and around, trying to figure out a way to install a shower in the main floor bathroom. By Jove, we've got it!

In the 'blue popcorn' room there is a recessed shelving unit. Back in the day this was the doorway into the main floor's bathroom. When the renovated bathroom was put in the door was moved to the hallway. The old doorway, still framed, was closed off with the shelves. In the bathroom the wall is actually a false wall. We plan on taking this wall out, plus the shelves and the framing around it. This will gain us 6 - 8 inches on the interior of the bathroom, sufficient to install the new shower surround. We'll have to move the toilet 6 inches to the left, and move the door over, too. I'm sure we'll find a sink small enough to fit into the newly arranged bathroom. Can't wait!!

Tom has said that using the trailer's shower will become a burden, but it will all fade from memory as soon as the shower is installed, the sooner the better. Just throw money, right?

No comments:

Post a Comment