Tom spent his Sunday pulling wires and installing the electrical outlets, for each stall. They are all tied into a ground-fault interrupter (GFI) as per code. I went over to the old house and painted the front bedroom. What else are you going to do on a rainy day? Everybody stayed in all day, eating hay.
Sunday, December 12, 2010
Misty, Rainy Sunday
Tom spent his Sunday pulling wires and installing the electrical outlets, for each stall. They are all tied into a ground-fault interrupter (GFI) as per code. I went over to the old house and painted the front bedroom. What else are you going to do on a rainy day? Everybody stayed in all day, eating hay.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment